Pigging Solutions for Today's Pipeline Applications
Operating Procedure
Launching
The lauching valve is installed in the flow line with the body facing vertically upward or horizontal.
- Close ball as shown. Open body cavity. Vent/Bleeder valve
- Remove body plug. Load pig
- Replace body plug
Receiving
The receiving valve installed in the flow line with the body plug facing vertically downward. Horizontal or vertically upward.